Docs › AI Readers › Start, progress, cancel

Start, progress, cancel

Last updated June 3, 2026 · 3 min read

What happens after "Start" is pressed on the set-up screen.

AI Beta Readers reader selection — final state before clicking Start

Start

Confirm the cost estimate → "Start" → Slima:

  1. Swaps the workspace to the progress view for this run
  2. Starts running

(There's no separate "In progress" list — the run shows up in the Reading History tab on the left once it finishes.)

Progress page

Shows:

  • Progress bar + percentage
  • Status grid — each chosen reader (then, if you included the editor, each editor dimension) lights up one by one as it finishes, with a completed / total counter
  • A fixed "Estimated 2-5 minutes" note
  • A small ✕ button to cancel

You can leave

The progress view updates by polling while the tab stays open:

  • Switch to another book and write
  • Keep the tab open and the bar keeps moving

Note: the in-page progress relies on the tab staying open — if you close it, the bar stops updating. There's no completion notification (no desktop alert, email, or red dot); just reopen the work later and the finished report will be waiting in the Reading History tab.

Cancel a reading

On the progress view, the small ✕ button stops the run immediately:

  • No confirmation prompt — it aborts right away
  • It returns you to the set-up screen
  • No partial report is kept

Failed / stuck

Rare but possible: a run fails (rate limit, timeout, etc.). The progress view then shows the error message and a Back link:

  • Back returns you to the set-up screen
  • To try again, re-run from the set-up screen (a fresh run, from the start)
  • Multiple failures → use Report a bug or Contact support from inside Slima

Related

Try it in Slima

Open the app and do this with your own book. Free to start, no credit card.

Open Slima
Was this helpful?